01Register
Every named engagement, on one sheet
The project pages tell a handful of these at length. This is the complete schedule: what the job was, who it ran through, the role carried, and what the work produced.
Structural
Transport & energy
Water supply
15 engagements
R.01
Five-star hotel development, Kitisuru
Blue Rivet Engineering
R.02
CBK Pension Towers, Nairobi
Shomax Consulting Engineers
R.03
VisionOne Industrial Park, Nakuru
Blue Rivet Engineering
R.04
Imarika Sacco office block, Kilifi
—
R.05
Kanyakwar residential apartments, Kisumu
—
R.06
Kinanie maisonette, Athi River
—
R.07
Kipeto–Siruai Wind Farm, Kajiado
Sirius Project Logistics · Vestas A/S, Kuehne + Nagel
R.08
Chania Green Wind, 50 MW
Sirius Project Logistics · Vestas
R.09
Aperture Wind, 50 MW
Sirius Project Logistics · AMEA Power
R.10
Envision Energy wind delivery
Sirius Project Logistics
R.11
Fortescue green hydrogen, proposed 300 MW
Sirius Project Logistics
R.12
African Harbour, Nouadhibou–Zuerat
Sirius Project Logistics · Kuehne + Nagel
R.13
Four-Town water supply — Kericho, Kisii, Nyamira, Litein
Mangat I. B. Patel Consulting Engineers
R.14
Eldoret, Ellegirini, Kapsoya and Naiberi
Mangat I. B. Patel Consulting Engineers
R.15
Kenchic processing plant, Thika
Mangat I. B. Patel Consulting Engineers
Roles marked “—” are single-engagement appointments without a fixed period. A detailed CV is available on request.
Next step
A structure to design, a corridor to move a load along, or a build already on site?
That is a conversation worth having early, while the engineering decision can still be changed cheaply. Eng. Ombogo will say plainly where the work stands.