The project pages tell a handful of these at length. This is the complete schedule: what the job was, who it ran through, the role carried, and what the work produced.

Structural Transport & energy Water supply 15 engagements
R.01
Five-star hotel development, Kitisuru
Blue Rivet Engineering
Role
Structural engineer, incl. site review
Period
Current
Output
Site review, pour release, temporary-works checks
R.02
CBK Pension Towers, Nairobi
Shomax Consulting Engineers
Role
Part of the structural design team
Period
2016–2018
Output
Frame, basement and foundation systems; member detailing
R.03
VisionOne Industrial Park, Nakuru
Blue Rivet Engineering
Role
Design lead
Period
2018–2019
Output
Steel portal frames and heavy-load foundations
R.04
Imarika Sacco office block, Kilifi
Role
Structural design
Period
Output
Structural grid, spans, cores and load path
R.05
Kanyakwar residential apartments, Kisumu
Role
Independent design review
Period
Output
Review report: design basis, load paths, governing checks
R.06
Kinanie maisonette, Athi River
Role
Structural integrity audit
Period
Output
Audit report tracing every concern to the load path
R.07
Kipeto–Siruai Wind Farm, Kajiado
Sirius Project Logistics · Vestas A/S, Kuehne + Nagel
Role
Lead Civil Engineering Consultant
Period
Phase 2 upcoming
Output
Port and route feasibility; road-upgrade requirements
R.08
Chania Green Wind, 50 MW
Sirius Project Logistics · Vestas
Role
Route survey and swept-path analysis
Period
Output
Traffic Management Plan; road-modification cost matrix
R.09
Aperture Wind, 50 MW
Sirius Project Logistics · AMEA Power
Role
Access and route assessment
Period
Output
Transport-risk findings; pavement requirements
R.10
Envision Energy wind delivery
Sirius Project Logistics
Role
Lead Civil Engineering Consultant
Period
Output
Constraint register; access-road requirements
R.11
Fortescue green hydrogen, proposed 300 MW
Sirius Project Logistics
Role
Engineering team lead, pre-feasibility
Period
Output
Road-versus-rail comparison; civil works; transport EIA
R.12
African Harbour, Nouadhibou–Zuerat
Sirius Project Logistics · Kuehne + Nagel
Role
Corridor and rail feasibility
Period
Output
Road findings and Iron Ore Train feasibility advice
R.13
Four-Town water supply — Kericho, Kisii, Nyamira, Litein
Mangat I. B. Patel Consulting Engineers
Role
Graduate Civil Engineer
Period
2014–2015
Output
Feasibility, final design and contract documentation
R.14
Eldoret, Ellegirini, Kapsoya and Naiberi
Mangat I. B. Patel Consulting Engineers
Role
Graduate Civil Engineer
Period
2014–2015
Output
Transmission pipeline and treatment-works expansion
R.15
Kenchic processing plant, Thika
Mangat I. B. Patel Consulting Engineers
Role
Graduate Civil Engineer
Period
2015
Output
Supervision of water-supply works, 600 m³/day

Roles marked “—” are single-engagement appointments without a fixed period. A detailed CV is available on request.

Next step

A structure to design, a corridor to move a load along, or a build already on site?

That is a conversation worth having early, while the engineering decision can still be changed cheaply. Eng. Ombogo will say plainly where the work stands.