Transport and Infrastructure
20 June 2026
Why 80-metre wind blades fail Kenyan road geometry
On Kenyan wind projects, the binding constraint is rarely the wind — it is the worst metre of road between the port and the site.
Read post →Honest write-ups from the work — wind-blade logistics, high-rise structural decisions, WASH systems, and what we learned the hard way. By Eng. Victor Ombogo, EBK A3947.
Transport and Infrastructure
On Kenyan wind projects, the binding constraint is rarely the wind — it is the worst metre of road between the port and the site.
Read post →