I design and deliver Kenya's most ambitious infrastructure projects—from 100MW wind farms to landmark CBD towers. Trusted by Vestas, Fortescue, and AMEA Power for renewable energy and structural engineering excellence.
Trusted by Global Industry Leaders
Renewable energy, structural design, and infrastructure engineering—delivered from concept to commissioning.
Comprehensive engineering for utility-scale wind and solar installations, including complex transport logistics and grid integration.
Advanced structural analysis for high-rise towers, commercial complexes, and critical infrastructure—proven on landmark CBD developments.
Specialized logistics engineering for oversized cargo, highway rehabilitation, and municipal water systems across multiple counties.
From Kenya's renewable energy frontier to Nairobi's iconic skyline—engineering at scale.
Lead Civil Engineering Consultant for Vestas A/S and Kuehne & Nagel on Kenya's second-largest wind installation. Delivered transportation feasibility study for 60 wind turbines (80m+ blades) from Mombasa Port through 400km+ route to Kajiado County. Comprehensive route survey, swept path analysis, and road upgrade specifications.
Led structural engineering for Nairobi's iconic KSh 2.49B twin towers in Upper Hill CBD. 27 storeys. Curved glass façade. Solar-powered operations. 6-level basement parking. Recognized as one of Africa's most architecturally distinguished buildings.
Fortescue Future Industries (Australia) - Engineering team lead for multi-county logistics study. Route alignment, civil works management, and environmental assessments across Taita Taveta, Nakuru, Baringo, Isiolo, and Marsabit.
Renewable Energy →
Complete structural engineering for multi-building industrial complex in Nakuru County. Steel frame design, heavy-load foundation specifications, and industrial facility compliance.
Structural →
Municipal water treatment and distribution for four towns: Kericho, Kisii, Nyamira, and Litein. WASH facility design and wastewater treatment plants including screens, clarifiers, and sludge drying beds. Complete service from feasibility studies to commissioning.
Infrastructure →
Kuehne & Nagel (Dubai) - International logistics advisory for Port Nouadhibou to Zuerat mine. Railway feasibility study for the "Iron Ore Train" including capacity analysis and multi-modal transport options.
International →
Luxury hotel structural engineering in Nairobi. Demolition, renovation, and structural addition. Ongoing since 2022 with complex structural modifications and heritage preservation requirements.
Structural →
Chania Green 50MW (Vestas/Kuehne & Nagel), Aperture 50MW (AMEA Power), Envision Energy (China). Transportation logistics, route surveys, and swept path analysis for turbine delivery.
Wind Energy →International standards. Local expertise. Proven results on Kenya's most demanding infrastructure projects.
Delivered projects for Vestas (Denmark), Fortescue (Australia), AMEA Power (Dubai), and Kuehne & Nagel. I apply global best practices while navigating Kenyan regulatory environments and site conditions.
Deep technical knowledge in wind farm logistics, green hydrogen infrastructure, and grid integration. M.Sc. Energy Technology (JKUAT, in progress) complementing decade of practical renewable project delivery.
From 27-storey high-rise structural design to 100MW wind farm logistics—I deliver Kenya's most technically demanding infrastructure projects. Trusted with multi-billion shilling investments.
Registered Civil Engineer (EBK A3947), Corporate Member IEK, NEMA Associate Expert. FIDIC Contracts certified—ensuring compliance with international engineering standards and professional accountability.
From renewable energy infrastructure to landmark structures—I deliver projects that balance technical excellence with commercial viability. Schedule a consultation to discuss your requirements.
Initial assessment of project scope, technical requirements, site conditions, and regulatory considerations.
On-site assessment, geotechnical considerations, access requirements, and preliminary engineering feasibility.
Detailed scope of work, deliverables schedule, fee structure, and terms—typically within one week of site visit.
Response within 24 hours for all inquiries
Serving all counties across Kenya and select international projects